Problems to be paid attention to during initial installation and operation of high frequency welded pipe unit

Problems to be paid attention to during initial installation and operation of high frequency welded pipe unit

  • Categories:Technical info
  • Author:
  • Origin:
  • Time of issue:2021-03-03
  • Views:0

(Summary description)It is very necessary for the initial installation, commissioning and operation of high frequency welded pipe unit equipment, because we can only achieve perfection as far as possible

Problems to be paid attention to during initial installation and operation of high frequency welded pipe unit

(Summary description)It is very necessary for the initial installation, commissioning and operation of high frequency welded pipe unit equipment, because we can only achieve perfection as far as possible

  • Categories:Technical info
  • Author:
  • Origin:
  • Time of issue:2021-03-03
  • Views:0
Information

It is very necessary for the initial installation, commissioning and operation of high frequency welded pipe unit equipment, because we can only achieve perfection as far as possible, but perfection does not exist, and it is inevitable that unexpected situations will occur, which needs to be debugged and solved on site.

The following problems should be paid attention to when the equipment of high frequency welded pipe unit is installed and debugged on site. The first is the frequency debugging of high frequency welding machine, because in terms of the power of high frequency welding machine, it is often the same, but the set frequency is not the same when working. It is necessary to realize the debugging on site. If it is found that it is not suitable, it is necessary to replace the relevant components to meet the requirements The frequency setting of customer demand, which I met at the customer's site, after all, the high-frequency welding machine part is supplied by us, not produced by ourselves.

In fact, it is the debugging of the running direction and the electric control system. There are many cables for the equipment of the high-frequency welded pipe unit. If any one of the cables is wrongly connected or reversely connected, the running direction may be wrong. This is to be debugged and confirmed. In case of high-frequency sliding block at both ends of the unit will be reversed, it is necessary to check the horizontal distance between the screw thread and the horizontal axis.

In addition, after the installation and electric control debugging of the high frequency welded pipe unit equipment, the mold should be installed for trial production, so as to check whether the mold design is appropriate and whether the performance of the high frequency welded pipe unit equipment meets the design needs. After these are tested and qualified, they can be formally handed over to the customer.

Generally, there are not many problems in the equipment of high frequency welded pipe unit, but to do these work, it is necessary to ensure that there is no accident, and even if there is an accident, it can be handled in time, so that customers can feel that our product quality and service quality are relatively good.